Quantity surveyor — how we know
The page itself gives the judgements. This one gives what they rest on: which technologies bear on the work, how the estimate moved since language models reached the public, and the method behind both.
Which technologies matter here#
Four separate signals. They are deliberately not added together — a job exposed to two technologies is not twice as exposed.
How it got here#
The index is not a static number. This is where it would have sat at each capability checkpoint since ChatGPT — reconstructed, and labelled as such.
—— this stretch contains a verified event- - - no event in this stretch — reconstruction only0 = no task exposed, 100 = every task exposed
● 1 verified event for this occupation, plotted at the date it happened — the parts of the line near a marker are anchored to something checkable.
Starts at 36 because estimating software, rate libraries and model-based take-off were already in use well before this chart begins. It rises slowly, and the professional body's own surveys show why: the share of firms working from digital models for take-off and estimating barely moved between 2021 and 2023, even as AI tools for reading drawings and drafting documents arrived. It stays in the middle because valuations, variations, claims and whole-life cost and carbon still depend on a surveyor's judgement and negotiation.
A flat line is not a forecast of safety. It says which tasks automation has reached so far — the occupations that moved least here are the ones where the constraint is physical or regulatory, and both of those can change.
Written about this#
These pieces argue from the same records this page holds, and each of their sections names what it rests on.
Method and sources#
- Assessment date
- 2026-09-26
- Basis of the task judgements
- 2 evidence-backed · 4 platform inference · 0 not enough evidence
- Verified events
- 1