VOLOVLOAutomation risk & transition, task by task
AskOccupationsMajorsBusinessFoundersChangesNotesMethod
Search occupations, majors…
EN
  • English
  • 简体中文
  • 日本語
  • Español
  • Português
  • Français
VLO
VOLO

Understanding how automation changes work — task by task, with the evidence shown and the uncertainty admitted.

AskOccupationsMajorsBusinessFoundersChangesNotesMethodWill AI replace my job?AboutRole diagnosisOpen dataOntologyVOLO ProPrivacyTerms
© 2026 VOLO
Guides
Ask VOLOFor businessFor foundersRecent changesNotesRole diagnosisFirst AI experimentVOLO ProMethod & evidenceAboutFollow an occupationSearch
Occupations
All occupations
AI / software
Translator / InterpreterBank tellerCopywriterContent moderatorCustomer service representativeAdministrative assistantSoftware tester / QA engineerGraphic designerParalegalVideo editorAccountant / BookkeeperMarketing specialistFrontend developerTax preparer / tax agentVoice actorMedical coderData analystInsurance claims handlerTechnical writer / documentation engineerJunior software developerInsurance underwriterHR / recruiterLoan officer / credit officerFinancial analystProcurement / supply chain specialistJournalistSales / account managerReal estate agentIT support specialist / helpdeskAuditorManagement consultantBackend developerAI researcherProduct / UX designerBusiness systems ownerE-commerce operations specialistActuaryRadiologistData engineerProject managerLawyerMedical assistant / clinic assistantQuantity surveyorMachine learning engineerExperienced software engineerDevOps / platform / SRE engineerProduct managerPharmacistPartnerships / channel managerSecurity analyst (SOC)Financial adviser / financial plannerCompliance officerLibrarianArchitectFirst-line manager / team supervisorCounsellor / therapistRetail salesperson / shop assistantCivil / structural engineerSecurity guardBus driverInsurance agentSchool teacherGeneral practitioner / primary care doctorAirline pilotWaiter / restaurant serverRadiographer / radiologic technologistAuto mechanic / vehicle technicianPolice officerSonographerAir traffic controllerVeterinarianPhysiotherapist / rehabilitation therapistDentistConstruction workerSocial workerRegistered nurseCare worker / nursing assistantPlumberAI implementation lead
RPA / self-service
Government service clerkOperations coordinatorMetro train driverReceptionist / front desk
Robotics
Retail cashier / shop assistantContainer port workerWarehouse workerAssembly line workerMedical laboratory technicianWelderChef / cookCleaner / janitorFarmerFirefighterCabin crewElectrician
Autonomous driving
Ride-hail / taxi driverTruck driverDelivery rider / courier
Majors
All majorsEnglish / Foreign languagesComputer scienceAccountingPsychologyJournalism / CommunicationFinanceLawVisual communication designMarketingNursingBusiness administrationEducation and teacher trainingArchitecturePublic administrationMedicineHospitality and tourism managementEconomicsInformation systems
Enter as:I have a jobI am studyingI run a companyI am building something
Recent changes›Project manager›2024-04-30
Worker adoptionCognitive automation2024-04-30

PMI's 2024 survey of 500 project professionals who already use generative AI: 53% use it to summarise and review content, 46% for planning and monitoring

Project manageroccupation page →
Event date / reported
2024-04-30 · reported 2024-09-01
Evidence stage
Worker adoptionMeasured, large-scale use of a tool for real work, where the decision to use it was the worker's rather than an employer's. It is more than a capability record — the work is real, not a demo — and less than a deployment record, because no employer put it into production, required it, or built a process around it. Weighted `cautious`: `automating` means the machine can do the task AND there are adoption signs, and this is an adoption sign — but usage can be experimental, and much of the measurement comes from a party with a stake, so one record is never enough and two independent ones are. Note who is counting. Vendor telemetry sees this directly and sells the tool, so such a record names that stake in its scope; a statistics agency asking firms whether their workers use AI in tasks sees the same channel with no stake at all, and that is the better source where it exists.
Tasks this bears on
Status reports, minutes and summaries
Writing the weekly status report, the meeting minutes, the executive summary and the notes that keep everyone working from the same picture.
Automating✓ Evidence-backed
Building and updating the plan
Breaking the work down, sequencing it, estimating it and re-planning when something slips.
Being augmented✓ Evidence-backed
Tracking risks, costs and changes
Keeping the risk log, watching the budget, and assessing what each requested change will do to scope, time and money.
Being augmented✓ Evidence-backed
Where this applies
The profession's own body surveyed 500 project professionals, each representing their organisation, across 18 industry sectors in 12 countries, between March and April 2024. Using generative AI for at least some project work was a prerequisite for taking part, so every figure describes people who already use it, not project managers in general; 61% of respondents were in the United States and 28% were project managers, the rest other project roles. Asked which activities they use it for, 53% named summarising and reviewing content (project documentation and reports, plan reviews, executive summaries, meeting discussions), 46% planning and monitoring, 37% risk identification and management and 32% budgeting and cost management; 43% used it for more than half of their project task execution. These are individual, self-reported uses; the survey does not measure whether organisations need fewer project staff, and it does not report errors.
What this means
Among project professionals who already use generative AI, the writing around a project is where it is used most: summarising documents, reviewing plans, executive summaries and meeting notes. Planning comes next, and risk and budget work less often.
What it does not yet show
Only people who already use these tools were surveyed, so it says nothing about how common this is across the profession, and it measures individual use rather than any change in project staffing.
What you can check
Open PMI's report "Pushing the Limits: Transforming Project Management With GenAI Innovation", find Figure 9 and the note under it beginning "We asked respondents for which activities they utilized GenAI".
Does it change the assessment?
No. The impact index is never moved by a single event, and this stage does not move one on its own: a "Worker adoption" record counts toward a judgement but needs a second, independent record before the judgement rests on evidence. This one is counted; on its own it changed nothing.
Source
Project Management Institute (PMI), "Pushing the Limits: Transforming Project Management With GenAI Innovation" (September 2024) · verified 2026-09-27 · Claude (VOLO agent) · interpreted 2026-09-27 · Claude (VOLO agent)
Primary source — published by the party that did this, or the authority of record. No co-signature needed.
All changes for Project manager →All recent changes →How events become evidence →